by brandthis | Jan 28, 2022
SEPP Seniors Living The construction of a Senior’s living with basement level parking, 45 units across the lower and upper ground floor and level 1 residences spanning across a site area of 6,304 m2. S&G Consultants completed the stormwater drainage concept design...
by brandthis | Jan 28, 2022
Middleton & Hughes Avenue,Castle Hill The construction of an 8-storey residential building with 2 levels of basement car parking and roof level communal terraces for the residents. S&G Consultants completed the DA stage stormwater concept design, public domain...
by brandthis | Jan 28, 2022
Liverpool Road,Ashfield The construction of a residential flat building consisting of 46 units across 7 storeys and 54 basement carparking spaces. S&G Consultants completed the stormwater drainage design at DA stage and the accompanying flood study of the site....
by brandthis | Jan 28, 2022
Queen Street,Auburn The construction of a residential flat building consisting of 50 units across 7 storeys and 54 basement carparking spaces. S&G Consultants have completed the stormwater drainage design and flood impact study at DA stage. Location: 28-32...
by brandthis | Jan 28, 2022
Carinya Street,Blacktown The construction of a residential flat building of 4 storeys consisting of 50 units and 65 car parking spaces in the basement. S&G Consultants have completed the DA Stage stormwater design. Location: 27 Abacus Parade, Werrington...
Recent Comments